› UKTH forums › ๐ก Broadband Tech & ISPโs › FTTP & FTTH › Openreach Trial New FTTP Option for Copper Lines with Complex Faults Interesting article from ISPreview – Network access providerย Openreachย has notified UK broadband ISPs about a new Complex to Fibre (C2F) trial, which could result in some copper-line based customers being given...
Interesting article from ISPreview – Network access providerย Openreachย has notified UK broadband ISPs about a new Complex to Fibre (C2F) trial, which could result in some copper-line based customers being given a Fibre-to-the-Premises (FTTP) service in situations where itโs available and repairing the existing copper line would be too complex / costly.
At presentย Openreachย is on the long journey to both build and migrate customers away from copper-based lines and on to full fibre networks. As part of that theyโre looking to find opportunities to migrate lines toย FTTPย where it is to โeveryoneโs benefitโ (Reactive and Proactive migrations).
โOne of the most time-consuming copper repairs are those which require โ2nd Stageโ work (excavations to get to cables, for example). Openreach is proposing a trial to understand the potential benefits of installing FTTP in place of repairing the copper where an Openreach engineer attends a copper repair and identifies that 2nd stage work is required to repair the copper service,โ said the operator.
Read full story below:
Openreach Trial New FTTP Option for Copper Lines with Complex Faults
In a completely sane world, madness is the only freedom (J.G.Ballard).
You need to login in order to vote
Following on from above:
The trial period for the Complex to Fibre (C2F) trial is the six months from 12 January 2023 to 13 July 2023 inclusive. The trial will cover any orders where the C2F process is initiated between these dates.
To be eligible for fast-track (which enables us to offer an earlier FTTP installation), orders must be placed in Northern Ireland after being invited to do so by the Openreach desk agent.
GEN097/22 Complex Fault to Fibre Trial (briefing) link below
https://www.openreach.co.uk/cpportal/updates/briefings/general-briefings/gen09722